30 Years of Experience
2008 marks the 30th anniversary of Hill Brothers Construction Company. The following is only a partial listing of the projects that Hill Brothers has completed over the years and some that we are currently involved in. |
| |
| |
National Railcar Facility, Earthwork & Drainage (7650) |
 |
Hill Brothers is currently performing the Earthwork & Drainage Package for the new Alabama Railcar Facility to be constructed in Cherokee, Alabama.
[read more] |
| |
|
| |
PACCAR - Engine Factory Site Preparation (7620) |
 |
Hill Brothers was awarded the Site Civil Construction Package for the new PACCAR Facility to be constructed in Columbus, MS.
[read more] |
| |
|
| |
Toyota Manufacturing Facility - Phase A (7575) |
 |
Hill Brothers was awarded the Initial Site Clearing and Grubbing Contract for the new Toyota Manufacturing Facility to be constructed in Blue Springs, Mississippi.
[read more] |
| |
|
| |
CN Johnston Yard Reconstruction Stage 1 (7550) |
 |
This ongoing project for Canadian National Railroad involves the removal of existing tracks and turnouts; approximately 500,000 cubic yards of grading work and track roadbed construction.
[read more] |
| |
|
| |
CN C-Yard Bridges (7545) |
 |
This project involves the construction of three new steel and concrete bridges located at mile LY5.50, Yazoo Subdivision, near Memphis, Tennessee.
[read more] |
| |
|
| |
Gulfport-Biloxi Airport (7515) |
 |
Hill Brothers was awarded the Gulfport-Biloxi International Airport “2006 Airfield Improvements” contract.
[read more] |
| |
|
| |
St. Francisville Earthwork and Drainage (7495) |
 |
Hill Brothers was awarded the Clearing and Grubbing / Earthwork and Drainage Package for the East and West Approaches to the John James Audubon Bridge across the Mississippi River.
[read more] |
| |
|
| |
London Avenue Canal Seepage Cutoff (7450) |
 |
Hill Brothers was awarded this project by the New Orleans District Corp of Engineers as part of their Emergency Restoration Plan - The London Avenue Canal Levees Seepage Cutoff Project located in the Lake Pontchartrain Louisiana Vicinity.
[read more] |
| |
|
| |
Kissimmee River Restoration Project (7445) |
 |
Hill Brothers performed as a major subcontractor on the Kissimmee River Restoration Project, Contract 13A, located in Okeechobee and Highlands Counties, Florida.
[read more] |
| |
|
| |
Custer Boulevard, Highway 22 (7440) |
 |
This $17.4 million contract with the Arkansas Highway and Transportation Department is the construction of 2.108 miles of roadway embankment for Highway 71, a bridge structure on State Hwy 22 and the installation of a signal at State Hwy 22 and 59 through Fort Chafee in Sebastian County.
[read more] |
| |
|
| |
KCS Deramus Yard Reconstruction (7315) |
 |
The Hill Brothers/Wilbur Smith Team’s Design-Build proposal was selected to perform the reconstruction of the Deramus Yard in Shreveport, Louisiana.
[read more] |
| |
|
| |
Highway 82 Greenville Bridge and Approaches (7295) |
 |
The Highway 82 Greenville Bridge and Approach Project, in Greenville, Mississippi is an $85 million contract that is approximately 90 percent complete.
[read more] |
| |
|
| |
Barnes Crossing Sewer Improvements (7260) |
 |
This project consists of a sewage pumping station, wet well structure, pumps, controls, electrical, metal building, air scrubber system, standby electric power, flow metering, site work, fencing, access roads, and erosion control.The Sewage Pumping Station includes the excavation of approximately 6,000 cubic yards of material as well as a poured in place concrete structure constructed some 42 feet deep.
[read more] |
| |
|
| |
CN Railroad Bridge Over Willow Creek (7090) |
 |
This project consists of constructing a new concrete trestle on offset alignment over Willow Creek, mile 368.90, Cairo Subdivision, in Wickliffe, Kentucky for Canadian National Railroad. The railroad bridge that was constructed is 3,396.75 linear feet.
[read more] |
| |
|
| |
Shelby/Fayette Counties - State Route 385 (6975) |
 |
This project consisted of grading, drainage, construction of eight (8) bridges, six (6) retaining walls, and partial paving on State Route 385 in Shelby and Fayette Counties in Tennessee.
[read more] |
| |
|
| |
The Stack - Phase III: I-20, I-55 and US Hwy 49 (6965) |
 |
This contract is a three-year project that consists of a directional interchange connecting Interstates 20 and 55 and US 49 in a complex plan requiring mostly night and weekend work.
[read more] |
| |
|
| |
Natchez Trace Parkway (6925) |
 |
Hill Brothers was instrumental in the final phases of the parkway’s construction, in which several miles of parkway and seven bridges were constructed.
[read more] |
| |
|
| |
Choctaw Power Generation Plant (6890) |
 |
Construction of this project consisted of clearing, cut and fill, erosion control, storm drainage and circulating water pipe.
[read more] |
| |
|
| |
CN / IC Railroad Bridge Over Wolf River (6880) |
 |
This project was designed to be constructed under a live track for continuous operation of the rail.
[read more] |
| |
|
| |
Medical Center Rail Extensions (6770) |
 |
The Medical Center Rail Extension was designed to extend the existing trolley line from the downtown area to the Medical Center and Mid-Town area along Madison Avenue.
[read more] |
| |
|
| |
Tunica River Park Phase I (6760) |
 |
This project is located adjacent to the Mississippi River just below the Fitzgerald Casino and will serve as a marina for tour boats and paddle wheelers.
[read more] |
| |
|
| |
U.S. 78 Bypass - Corridor "X" (6715) |
 |
Highway 78 Bypass around Jasper, Alabama known as Corridor "X" was a 4 mile grading, drainage, base and paving project including bridges and box culverts.The items of work consisted of 361 acres of clearing with 4.6 million cubic yards excavation and one million cubic yards of shot rock.
[read more] |
| |
|
| |
TVA - Kemper County (6700) |
 |
The Tennessee Valley Authority – Kemper County Project consists of the following items of work: 50 acres of clearing and grubbing; 44 acres of seeding and mulching; 63,750 tons of crushed stone; storm water detention pond; approximately 800,000 cubic yards site excavation and structural fill; storm sewer system; and 8,600 linear feet of pipe.
[read more] |
| |
|
| |
Magnolia Energy Project (6685) |
 |
The Magnolia Energy Power Plant Project performed by Hill Brothers Construction Company was constructed on a 120-acre site located in Ashland, Mississippi.
[read more] |
| |
|
| |
Highway 25 Bridge Replacement (6670) |
 |
This project consisted of 12 bridges located on Highway 25 south of Starkville, Mississippi.
[read more] |
| |
|
| |
Nissan Phase "C" Site Preparation (6655) |
 |
This project was approximately an 80 acre site in which Hill Brothers Construction Company hauled over 2.8 million cubic yards of borrow dirt within an 80 day period.
[read more] |
| |
|
| |
Martin Luther King Blvd. Bridge Replacement (6640) |
 |
The Martin Luther King Boulevard Bridge Project consisted of the removal of a 500 linear ft.
[read more] |
| |
|
| |
Lagoon Creek Gas Turbine Generation Plant (6565) |
 |
Construction of this project consisted of clearing, cut, fill, erosion control, asphalt and concrete paving, grassing, grading, drainage, underground piping, underground electrical, turbine foundations, miscellaneous foundations and auger cast piling.
[read more] |
| |
|
| |
MS Highway 302 (6485) |
 |
The MS Highway 302 construction project, located between the Desoto - Marshall County Line and US Highway 72 in Marshall County was a 9.3 mile project that involved base and pave, bridge construction, erosion control, pavement markings, signing and guard rail.
[read more] |
| |
|
| |
Desoto County Civic Center (6370) |
 |
Construction of this project consisted of clearing, cut, fill, erosion control, asphalt and concrete paving, grassing, grading, drainage, foundation construction, reinforced concrete wall construction, elevated concrete slabs and beams, columns, slabs, door and hardware procurement and installation, millwork, interior flooring, toilet partitions, miscellaneous interior finishes, retaining walls, site furnishings and drilled piers.
[read more] |
| |
|
| |
Winchester Tunnel (6175) |
 |
The Winchester Tunnel project, located at Memphis International Airport and Winchester Avenue, was the removal of an existing 848 linear ft.
[read more] |
| |
|
| |
Horshoe Casino Parking Garage (6075) |
 |
This project consisted of the demolition of the existing parking areas, relocation of utilities and new site construction for a 3-story parking garage.
[read more] |
| |
|
| |
Highway 61 Road & Bridge (5970) |
 |
This project consisted of adding two traffic lanes parallel with existing MS Highway 61 for 9.933 miles from the Tennessee line to MS Highway 3 in Desoto County, MS.
[read more] |
| |
|
| |
Nonconnah Parkway (5935) |
 |
The Nonconnah Parkway Project was the construction of 4.5 miles of a four lane, access-controlled thoroughfare (known as Route No.
[read more] |
| |
|
|
|